Speicher Karstädt

21 MW, 35 MWh (1.7 hours) in Karstädt, Brandenburg, registered as operating since 28 February 2025. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Speicher KarstädtSEE956596589897213528 February 2025Lithiumchecked

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Obton Karstädt GmbH & Co. KGAmtsgericht Flensburg HRA 10947Handewitt, Schleswig-Holstein

Owner. Obton A/S, Denmark: each company's limited partner is an Obton investor partnership (P/S) in Aarhus, through Obton Storage 1 Karstädt P/S, Aarhus / Dänemark (Dänisches Gewerbeamt, CVR-Nr. 43873512), amount 1,000 euros (sole limited partner). Confirmed in the commercial register. Evidence: Current printout (AD) of Amtsgericht Flensburg HRA 10947, retrieved 11 October 2026; last entry 20 March 2024. Checked 11 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

Owner, as publishedKyon Energy sold Karstädt to Danish company Obton in 2023 solarserver, 4 December 2023
Trades its outputenspired (cross-market optimisation) with Entelios (flexibility aggregation and trading) enspired press release, 19 December 2024
Power, as the owner gives it20.7 MW enspired press release, 19 December 2024
Energy, as the owner gives it41.4 (register holds 35.0 MWh; 35 MWh is the figure given for Tangermünde) enspired press release, 19 December 2024
Also publishedDeveloped by Kyon Energy and sold to Obton solarserver, 4 December 2023

From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.

Where it connects

Grid companyWEMAG Netz GmbH
Connected atmedium voltage
MunicipalityKarstädt, district of Prignitz
StateBrandenburg
Registered position53.1636, 11.7386
Register locationSEL959361089097

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 12 July 2025; last changed in the register on 1 October 2025. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.