Stendal BESS

104 MW, 209 MWh (2 hours) in Stendal, Sachsen-Anhalt, registered as operating since 30 July 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as one unit.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
Stendal BESSSEE96582239836310420930 July 2026Lithiumunder check

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
Seerose Energie GmbHAmtsgericht München HRB 285289München, Bayern

Owner. Nofar Energy, with a stake sold to EB-SIM (Evangelische Bank) in December 2025. Inferred: the operator shares a company address with this family, and its own entry was not read. Formerly Kyon Storage 231 GmbH (register name history); Nofar Energy, which now owns the Stendal project, sold a stake to EB-SIM in December 2025 Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

Owner, as publishedNofar Energy (Israeli developer and IPP) owns the Stendal project; it calls it its Stendal BESS project Nofar Energy press release (PR Newswire), 11 December 2024
Owner, as publishedNofar Energy sold a stake (size not disclosed) to EB - Sustainable Investment Management (EB-SIM), a subsidiary of Evangelische Bank; announced 2026-01-28 Osborne Clarke (Nofar adviser) news, 28 January 2026
Owner’s parentEB-SIM is a subsidiary of Evangelische Bank Osborne Clarke (Nofar adviser) news, 28 January 2026
Trades its outputToll counterparty (unnamed major global energy corporation) holds the battery flexibility under the 7-year agreement Clifford Chance (Nofar adviser) news, 6 March 2025
Contract7-year fixed-price Flexibility Purchase Agreement (described as a tolling agreement) for 2027 to 2033 with an unnamed major global energy corporation; option to run merchant before January 2027 Nofar Energy press release (PR Newswire), 11 December 2024
Battery systemSungrow, 46 PowerTitan 2.0 units and 23 medium-voltage stations Sungrow case study
Power, as the owner gives it104.5 MW Osborne Clarke (Nofar adviser) news, 28 January 2026
Power, as the owner gives it116 (Sungrow case study; differs from Nofar 104.5 MW and register 104.5 MW) Sungrow case study
Energy, as the owner gives it209 MWh Nofar Energy press release (PR Newswire), 11 December 2024
Energy, as the owner gives it230 (Sungrow case study; differs from Nofar 209 MWh and register 209 MWh) Sungrow case study
In operation, as the owner gives itCOD scheduled for 2026; project still under construction at 2026-01-28 Osborne Clarke (Nofar adviser) news, 28 January 2026
Also publishedNORD/LB provided EUR 86.5 million of long-term project debt pv magazine International, 6 March 2025

From published documents: the owners’, builders’ and optimisers’ own announcements and the trade press, each linked. Where the owner’s power or energy differs from the register’s, both are shown and every figure on this site uses the register’s.

Where it connects

Grid companyAvacon Netz GmbH
Connected athigh voltage (110 kV)
MunicipalityStendal
StateSachsen-Anhalt
PermitBauaufsichtsamt Hansestadt Stendal, 63/VV/0029-2023
Registered position52.5710, 11.7297
Register locationSEL960756067781

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 24 August 2026; last changed in the register on 24 August 2026. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.