SWM HKW Freimann

9 MW, 9.4 MWh (1 hours) in München, Bayern, registered as operating since 23 December 2020. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.

What it is

The register holds this battery as four units.

UnitRegister numberMWMWhCommissionedBatteryGrid operator check
SWM HKW Freimann BSP3SEE9030957081202.22.323 December 2020Lithiumchecked
SWM HKW Freimann BSP2SEE9248213389092.22.323 December 2020Lithiumchecked
SWM HKW Freimann BSP1SEE9610837455262.22.323 December 2020Lithiumchecked
SWM HKW Freimann BSP4SEE9811614195382.22.323 December 2020Lithiumchecked

Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.

Who runs it and who owns it

Operator in the registerCommercial register entry, as the operator gave itSeat
SWM Services GmbHAmtsgericht München HRB 126674München, Bayern

Owner. Stadtwerke München. Reported in the trade press and not yet confirmed by the owner or the commercial register. Evidence: ZfK, 14 May 2021: "Die Stadtwerke München haben ihren Stromspeicher am Heizkraftwerk Freimann in Betrieb genommen.". Checked 16 October 2026. Every battery of this family.

The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.

Who trades it and what it is built from

No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.

Where it connects

Grid companySWM Infrastruktur GmbH & Co. KG
Connected atmedium voltage
MunicipalityMünchen
StateBayern
Registered position48.1890, 11.5960
Register locationSEL946807245537

As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.

What has changed in the register

First registered on 29 April 2021; last changed in the register on 22 June 2022. No change has shown in our reads since the first, on 10 October 2026.

What this page cannot show

Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.

Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.