Tiste BESS
11 MW, 25 MWh (2.2 hours) in Tiste, Niedersachsen, registered as operating since 4 May 2026. Everything on this page is read from Germany’s register of power units and the other published records named beside each fact.
What it is
The register holds this battery as three units.
| Unit | Register number | MW | MWh | Commissioned | Battery | Grid operator check |
|---|---|---|---|---|---|---|
| Tiste BESS 2 | SEE978334406730 | 3.8 | 8.3 | 4 May 2026 | Lithium | under check |
| Tiste BESS 3 | SEE993715624916 | 3.8 | 8.3 | 4 May 2026 | Lithium | checked |
| Tiste BESS | SEE921274103399 | 3.8 | 8.9 | 4 May 2026 | Lithium | under check |
Power is the net power the operator registered, the most the unit may feed into the grid. Energy is the usable capacity of the unit’s installation. A grid operator check marked “checked” means the grid company has confirmed the entry; “under check” means it has not yet. On the large sites we compared, the register’s commissioning date often came months before the owner’s announced start, which suggests it records first energisation.
Who runs it and who owns it
| Operator in the register | Commercial register entry, as the operator gave it | Seat |
|---|---|---|
| NewDev Solarpark Tiste ApS & Co. KG | Amtsgericht Flensburg HRA 11363FL | Husum, Schleswig-Holstein |
Owner. Nordic Solar. Reported in the trade press and not yet confirmed by the owner or the commercial register. Evidence: SolarQuarter, 28 May 2026: "Nordic Solar's expanding energy storage portfolio". Checked 16 October 2026. Every battery of this family.
The register names the operator, the company that runs the unit. The owner behind it comes from the commercial register (Handelsregister) or the owner’s own publication, as marked. The register number is the one the operator typed in; on 11 October 2026 we found it wrong or missing for 26 of the companies we looked up.
Who trades it and what it is built from
No published source we have found names who trades this battery, who built it or whose cells it uses. Fields we cannot source are left out.
Where it connects
| Grid company | EWE NETZ GmbH |
| Connected at | the high to medium voltage transformer level |
| Municipality | Tiste, district of Rotenburg (Wümme) |
| State | Niedersachsen |
| Registered position | 53.2973, 9.5917 |
| Register location | SEL999788726595 |
As registered. The grid company and voltage come from the register’s public unit table; the position is the one the operator registered. See it on the Atlas.
What has changed in the register
First registered on 28 August 2026; last changed in the register on 12 October 2026.
| Seen | Unit | What changed | From | To |
|---|---|---|---|---|
| 13 October 2026 | Tiste BESS | Gross power | 3.8 MW | 3.8 MW |
| 13 October 2026 | Tiste BESS | Net power | 3.8 MW | 3.8 MW |
| 13 October 2026 | Tiste BESS | Usable capacity | 8.3 MWh | 8.9 MWh |
| 15 October 2026 | Tiste BESS | Net power | 3.8 MW | 3.8 MW |
What this page cannot show
Germany publishes no battery’s metered output. On 11 October 2026 we checked the four public sources that might carry it: the ENTSO-E Transparency Platform, SMARD, the yearly EEG data and the transmission companies’ redispatch records. None gives the output of any German battery, one by one or as a fleet. So this page cannot say what the battery exported, imported or earned, as Britain’s battery pages do.
Sources: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung 2.0: the full export of 15 October 2026 and the public unit table of 15 October 2026. Company details from the register’s market actor table. Owners from the commercial register and the owners’ publications, as marked. Tender awards from the Bundesnetzagentur’s award lists.