Konttisuo wind farm BESS (Downing)

Announced, 20 MW, owned by Downing. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power20 MW
StatusAnnounced, as of 22 April 2026
Placed on the mapnot placed: no municipality in any source

Who is behind it

OwnerDowning
DeveloperDowning

Downing (UK). YTJ lists Konttisuon Tuulivoima Oy (3127608-5), the wind farm company; no source says it holds the battery.

Not published anywhere we have found: ultimate owner, built by, cells. The page says so rather than guessing.

What the sources say

Downing (22 Apr 2026): developing a 20 MW BESS at its c.30 MW Konttisuo wind farm (bought 2022), Southern Ostrobothnia; municipality not given.

Evidence and sources

From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B058.