Paarmasuontie energy storage, Raahe
Announced, 1.9 MW · 4.2 MWh, in Raahe. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 1.9 MW |
| Capacity | 4.2 MWh |
| Duration | 2.2 hours |
| Status | Announced, as of 2 March 2026 |
| Municipality | Raahe |
| Placed on the map | at the centre of Raahe, its municipality (GeoNames) |
Who is behind it
No source read names who is behind it.
Applicant not named in the statement.
Not published anywhere we have found: owner, ultimate owner, developer, built by, cells. The page says so rather than guessing.
What the sources say
Raahe planning statement of 2 Mar 2026 on a placement permit application (LP-678-2026-00060) at Paarmasuontie 75, property 678-412-42-266: "at most 1.9 MW / 4.16 MWh", so the figures are a ceiling. Decision not found.
Evidence and sources
From the owners’, developers’ and builders’ own releases, council decisions and permit bulletins, read by Vitreous and checked against the owners’ own words on 12 October 2026; a bracket such as “(Energy-Storage.news only)” in a field means the trade press is still the only source for it. Fingrid publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Fingrid’s markets is on the markets page, for the whole market and never for a named battery. List id FI-B069.