Batterij Groen expansion (phase 2)
Being built, size not stated by any source, in Dronten, owned by Pure Energie. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | not stated by any source |
| Capacity | 65 MWh |
| Status | Being built, as of 20 October 2026 |
| Stated date | 2026, December 2026 (full system) |
| Municipality | Dronten, Olsterdwarspad, Flevoland |
| Grid connection | Gesloten Distributiesysteem Groen, connected to TenneT HV; GDG Groen station |
| Placed on the map | at the centre of Dronten, its municipality (GeoNames) |
| How sure | A dated source confirms it |
Who is behind it
| Owner | Pure Energie |
| Traded by | Pure Energie |
Not published anywhere we have found: built by.
What the sources say
Adds 65 MWh to the operating Batterij Groen, taking it from 65 to 130 MWh at 31.6 MW (4 hours). MW left blank because the power rating does not rise. Financial close and construction start announced 14 July 2026. New in this round.
Evidence and sources
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B54.