Vitreous LabsEnergy transparency
The Netherlands · the named batteries

Batterij Groen (Dronter Energie Opslag)

Operating, 32 MW · 65 MWh, in Dronten, owned by Pure Energie. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power32 MW
Capacity65 MWh
Duration2.1 hours
StatusOperating, as of 20 October 2026
Stated date2 September 2026, operating 'for some months'; officially opened 2 September 2026
MunicipalityDronten, Olsterdwarspad, Flevoland
Grid connectionGesloten Distributiesysteem Groen (Windplan Groen), connected to TenneT HV; GDG Groen station
Placed on the mapat the site itself, as mapped on OpenStreetMap (Batterij Groen)
How sureA dated source confirms it

Who is behind it

OwnerPure Energie
Traded byPure Energie

Not published anywhere we have found: built by.

What the sources say

Conflict: Nov 2024 release gives c. 63 MWh; 2025 and 2026 sources give 65 MWh. Planned to double to 130 MWh by end 2026. One of three DEO batteries (with FlevoBESS and GreenPowerBank Dronten). DEO first phase 'ruim 90 MW en 320 MWh' fits 3 x 31.6 MW and 65 + 126.4 + 126.4 MWh.; The 14 July 2026 release gives financial close on an expansion from 65 to 130 MWh at 31.6 MW, full system due December 2026. The expansion is a separate row so that operating and construction totals stay apart. Pure Energie now gives the whole Dronter Energie Opslag park as 95 MW / 380 MWh. Confirmed for the operating 65 MWh.

Evidence and sources

From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B12.

All batteries  ·  On the map