Vitreous LabsEnergy transparency
The Netherlands · the named batteries

Batterij Park Zeewolde (BPZ, phase 1)

Operating, 31 MW · 65 MWh, in Zeewolde, owned by Local residents through Windpark Zeewolde / De Nieuwe Molenaars (200+ farmers, residents, businesses). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power31 MW
Capacity65 MWh
Duration2.1 hours
StatusOperating, as of 20 October 2026
Stated date24 October 2025, officially opened
MunicipalityZeewolde, Flevoland
Grid connectionnext to the Zeewolde wind farm substation; Windpark Zeewolde transformer station
Placed on the mapat the site itself, as mapped on OpenStreetMap (Batterijpark Zeewolde)
How sureA dated source confirms it

Who is behind it

OwnerLocal residents through Windpark Zeewolde / De Nieuwe Molenaars (200+ farmers, residents, businesses)
Traded byEneco (market optimisation)
Built byRolls-Royce (mtu EnergyPack)

What the sources say

Rolls-Royce release gives both 'summer 2025' and 'autumn 2025'. Energy Storage NL's market survey (2 October 2025) still calls it an announced project. No operating confirmation found.; Status kept at construction: construction is confirmed (November 2024), operation is not. Planned dates (summer or autumn 2025) have passed. Probable. The owner gives 31 MW; Rolls-Royce, the supplier, gave 32.6 MW.

Evidence and sources

From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B23.