Vitreous LabsEnergy transparency
The Netherlands · the named batteries

Eleqtis battery, Zeewolde

Announced, 35 MW · 144 MWh, in Zeewolde, owned by Eleqtis B.V. (commissioning party). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power35 MW
Capacity144 MWh
Duration4.1 hours
StatusAnnounced, as of 20 October 2026
Stated date2026, planned 2026
MunicipalityZeewolde, Flevoland
Placed on the mapat the centre of Zeewolde, its municipality (GeoNames)
How sureProbable: the sources agree but none confirms every fact

Who is behind it

OwnerEleqtis B.V. (commissioning party)
Built byRolls-Royce (mtu EnergyPack)

Not published anywhere we have found: traded by.

What the sources say

A separate battery at the Zeewolde wind park site, most likely the one Rolls-Royce called BES Vogelweg in 2024; not a second phase of Batterij Park Zeewolde. No source confirms an investment decision.

Evidence and sources

From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B38.

All batteries  ·  On the map