The Netherlands · the named batteries
Enecogen battery (Rotterdam port)
Investment decided, not yet being built, 50 MW · 200 MWh, in Rotterdam, owned by Eneco and EP NL (50/50). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 50 MW |
| Capacity | 200 MWh |
| Duration | 4.0 hours |
| Status | Investment decided, not yet being built, as of 20 October 2026 |
| Stated date | 2027 |
| Municipality | Rotterdam, port, Enecogen site, Zuid-Holland |
| Grid connection | existing Enecogen power plant connection |
| Placed on the map | at the centre of Rotterdam, its municipality (GeoNames) |
| How sure | Probable: the sources agree but none confirms every fact |
Who is behind it
| Owner | Eneco and EP NL (50/50) |
| Traded by | Eneco and EP NL trading desks; Enecogen O&M |
Not published anywhere we have found: built by.
What the sources say
Construction start not confirmed.
Evidence and sources
- source: solarmagazine.nl/nieuws-zonne-energie/i41168/eneco-en-ep-nl-bouw…
- source: energy-storage.news
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B36.