Energyhub Branderwal
Operating, 20 MW · 80 MWh, in Kootwijkerbroek, owned by Energeion. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 20 MW |
| Capacity | 80 MWh |
| Duration | 4.0 hours |
| Status | Operating, as of 20 October 2026 |
| Stated date | 17 July 2026, officially put into use |
| Municipality | Kootwijkerbroek, Barneveld, Gelderland |
| Grid connection | Liander (first HV-level capacity-steering contract in Gelderland) |
| Placed on the map | at the site itself, as mapped on OpenStreetMap (Systeembatterij BESS Branderwal) |
| How sure | A dated source confirms it |
Who is behind it
| Owner | Energeion |
| Traded by | Energeion |
| Built by | Huawei LUNA2000 via Wattkraft Benelux |
What the sources say
The '20 MW' figure is extra grid capacity made available, not a stated battery rating, so MW is left blank. Co-located with a 28.7 MWp solar park.; Probable: the 22 August 2026 article describes it as built and in use, but MW is not published.
Evidence and sources
- source: solarmagazine.nl/nieuws-zonne-energie/i44574/project-van-de-week…
- source: solarmagazine.nl/nieuws-zonne-energie/i43939/project-van-de-week…
- source: energeion.nl/projecten/bess-branderwal
- source: energeion.nl/artikelen/batterijpark-branderwal-officieel-in-…
- position: openstreetmap.org/way/1543315108
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B18.