The Netherlands · the named batteries
EOS Bellingwolde
Announced, 36 MW · 144 MWh, in Bellingwolde, owned by Novar. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 36 MW |
| Capacity | 144 MWh |
| Duration | 4.0 hours |
| Status | Announced, as of 20 October 2026 |
| Municipality | Bellingwolde, Westerwolde, Groningen |
| Grid connection | within the Bellingwolde solar park |
| Placed on the map | at Bellingwolde, the place its source names (GeoNames) |
| How sure | Probable: the sources agree but none confirms every fact |
Who is behind it
| Owner | Novar |
Not published anywhere we have found: traded by, built by.
What the sources say
Permit application in progress in October 2025; construction not started. May be one of the 14 permitted Novar co-located projects (284 MW / 1,122 MWh, 10 August 2026), but that is not confirmed. New in this round.
Evidence and sources
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B55.