Vitreous LabsEnergy transparency
The Netherlands · the named batteries

GIGA Buffalo

Operating, 24 MW · 48 MWh, in Lelystad, owned by GIGA Storage. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power24 MW
Capacity48 MWh
Duration2.0 hours
StatusOperating, as of 20 October 2026
Stated dateOctober 2022, inaugurated
MunicipalityLelystad, WUR test site, Flevoland
Grid connectionWindnet smart grid at WUR site
Placed on the mapat the centre of Lelystad, its municipality (GeoNames)
How sureProbable: the sources agree but none confirms every fact

Who is behind it

OwnerGIGA Storage
Traded byEneco (lessee)
Built byWartsila

What the sources say

No 2025-26 source re-confirms it is still in service.; Probable: operating per 2022 sources, but no 2025 or 2026 source says it still runs. GIGA’s own page gives 25 MW; Eneco and Energy-Storage.news give 24 MW.

Evidence and sources

From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B08.