Vitreous LabsEnergy transparency
The Netherlands · the named batteries

GIGA Giraffe

Operating, 10 MW · 47 MWh, in Amsterdam, owned by GIGA Storage. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power10 MW
Capacity47 MWh
Duration4.7 hours
StatusOperating, as of 20 October 2026
Stated dateOctober 2025, live
MunicipalityAmsterdam, Westelijk Havengebied, Noord-Holland
Placed on the mapat the site itself, as mapped on OpenStreetMap (Giraffe)
How sureA dated source confirms it

Who is behind it

OwnerGIGA Storage
Traded byGIGA Storage
Built byTesla (12 Megapack 2XL); K Dekker and Van den Heuvel (construction)

What the sources say

Grid operator not stated (Liander would be expected, but no source says so).; lat/lon is the OpenStreetMap address point for Westhavenweg 55, Amsterdam, the address in the permit notice. Confirmed.

Evidence and sources

From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B10.

All batteries  ·  On the map