The Netherlands · the named batteries

GreenPowerBank Dronten (Dronter Energie Opslag)

Being built, 32 MW · 126 MWh, in Dronten, owned by Begro Energy Projects (GreenPowerBank Dronten B.V.). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power32 MW
Capacity126 MWh
Duration4.0 hours
StatusBeing built, as of 20 October 2026
Stated date2027, early 2027 (Begro); Ventolines plan: energisation July 2026, COD January 2027
MunicipalityDronten, Flevoland
Grid connectionGesloten Distributiesysteem Groen, connected to TenneT; GDG Groen station
Placed on the mapat the site itself, as mapped on OpenStreetMap (GreenPowerBank Dronten)
How sureProbable: the sources agree but none confirms every fact

Who is behind it

OwnerBegro Energy Projects (GreenPowerBank Dronten B.V.)
Traded byThe Optimiser Company (Begro subsidiary, trading)
Built byFluence (Gridstack Pro 5000); K_Dekker and Van den Heuvel (civil/electrical); Ventolines (project management)

What the sources say

Financial close Sept/Oct 2025, Rabobank co-financing.; Construction rests on an undated project-manager page and the October 2025 financial close. Begro also lists this site in its Project Volta sale portfolio as 31.5 MW / 126 MWh. Probable.

Evidence and sources

From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B31.