The Netherlands · the named batteries
GreenPowerBank Dronten (Dronter Energie Opslag)
Being built, 32 MW · 126 MWh, in Dronten, owned by Begro Energy Projects (GreenPowerBank Dronten B.V.). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 32 MW |
| Capacity | 126 MWh |
| Duration | 4.0 hours |
| Status | Being built, as of 20 October 2026 |
| Stated date | 2027, early 2027 (Begro); Ventolines plan: energisation July 2026, COD January 2027 |
| Municipality | Dronten, Flevoland |
| Grid connection | Gesloten Distributiesysteem Groen, connected to TenneT; GDG Groen station |
| Placed on the map | at the site itself, as mapped on OpenStreetMap (GreenPowerBank Dronten) |
| How sure | Probable: the sources agree but none confirms every fact |
Who is behind it
| Owner | Begro Energy Projects (GreenPowerBank Dronten B.V.) |
| Traded by | The Optimiser Company (Begro subsidiary, trading) |
| Built by | Fluence (Gridstack Pro 5000); K_Dekker and Van den Heuvel (civil/electrical); Ventolines (project management) |
What the sources say
Financial close Sept/Oct 2025, Rabobank co-financing.; Construction rests on an undated project-manager page and the October 2025 financial close. Begro also lists this site in its Project Volta sale portfolio as 31.5 MW / 126 MWh. Probable.
Evidence and sources
- source: solarmagazine.nl/nieuws-zonne-energie/i41773/begro-bereikt-finan…
- source: ventolines.nl/en/project/dronter-energy-storage
- position: openstreetmap.org/way/1419588355
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B31.