Musselkanaal - Ter Apelkanaal

Permitted, 500 MW · 2,000 MWh, in Westerwolde, owned by S4 Energy (bought LC Energy, Oct 2024). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power500 MW
Capacity2,000 MWh
Duration4.0 hours
StatusPermitted, as of 20 October 2026
Stated date2027, stated in 2024
MunicipalityWesterwolde, Bedrijventerrein Zuid-Groningen, Groningen
Grid connectionTenneT 380 kV (guaranteed connection)
Placed on the mapat the centre of Westerwolde, its municipality (GeoNames)
How sureProbable: the sources agree but none confirms every fact

Who is behind it

OwnerS4 Energy (bought LC Energy, Oct 2024)

Not published anywhere we have found: traded by, built by.

What the sources say

Permitted. No construction or financing found.