The Netherlands · the named batteries
Musselkanaal - Ter Apelkanaal
Permitted, 500 MW · 2,000 MWh, in Westerwolde, owned by S4 Energy (bought LC Energy, Oct 2024). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 500 MW |
| Capacity | 2,000 MWh |
| Duration | 4.0 hours |
| Status | Permitted, as of 20 October 2026 |
| Stated date | 2027, stated in 2024 |
| Municipality | Westerwolde, Bedrijventerrein Zuid-Groningen, Groningen |
| Grid connection | TenneT 380 kV (guaranteed connection) |
| Placed on the map | at the centre of Westerwolde, its municipality (GeoNames) |
| How sure | Probable: the sources agree but none confirms every fact |
Who is behind it
| Owner | S4 Energy (bought LC Energy, Oct 2024) |
Not published anywhere we have found: traded by, built by.
What the sources say
Permitted. No construction or financing found.
Evidence and sources
- source: solarmagazine.nl/nieuws-zonne-energie/i38466/groningen-krijgt-gr…
- source: energy-storage.news/tag/netherlands/page/5
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B42.