Operating, 10 MW · 9 MWh, in Heerhugowaard, owned by (not stated) S4 Energy; wind park owned by Eneco. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 10 MW |
| Capacity | 9 MWh |
| Duration | 0.9 hours |
| Status | Operating, as of 20 October 2026 |
| Stated date | 2022, work completed December 2021, switched on by October 2022 |
| Municipality | Heerhugowaard, Dijk en Waard, Noord-Holland |
| Grid connection | Windpark Luna connection |
| Placed on the map | at Heerhugowaard, the place its source names (GeoNames) |
| How sure | Probable: the sources agree but none confirms every fact |
Who is behind it
| Owner | (not stated) S4 Energy; wind park owned by Eneco |
| Traded by | S4 Energy |
| Built by | Leclanche (batteries, EPC); S4 Energy (KINEXT flywheels); ABB (drives) |
What the sources say
Both figures are for the whole battery and flywheel system: 10 MW (9 MW frequency control, 1 MW load shifting) and about 9 MWh. The battery share alone is not published. Dijk en Waard is my placement of Heerhugowaard (merged municipality since 2022). New in this round.
Evidence and sources
- source: leclanche.com/leclanche-completes-second-hybrid-energy-storag…
- source: solarmagazine.nl/nieuws-zonne-energie/i27033/s4-energy-verhoogt-…
- source: pv-magazine.com/2022/10/04/abb-to-stabilize-dutch-grid-with-9-m…
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B51.