Vopak Meeden battery
Announced, 150 MW, in near Meeden, owned by Vopak. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 150 MW |
| Status | Announced, as of 20 October 2026 |
| Stated date | 2028, contract start Q2 2028 |
| Municipality | near Meeden, Midden-Groningen, Groningen |
| Placed on the map | at Meeden, the place its source names (GeoNames) |
| How sure | Probable: the sources agree but none confirms every fact |
Who is behind it
| Owner | Vopak |
| Traded by | Vattenfall (tolls 100 MW / 400 MWh) |
Not published anywhere we have found: built by.
What the sources say
4-hour duration would mean about 600 MWh, but no source states the total. Possible duplicate: Vopak bought a 300 MW ready-to-build northern-NL project from BayWa r.e./GroenLeven (21 May 2025/23). This may be part of it. Not confirmed.
Evidence and sources
- source: solarmagazine.nl/nieuws-zonne-energie/i45071/batterijdeal-vatten…
- source: blackridgeresearch.com/news-releases/vattenfall-contracts-100-mw-stora…
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B40.