The Netherlands · the named batteries
Windpark De Plaet battery
Built or due, running not confirmed, 10 MW · 20 MWh, in Ooltgensplaat, owned by De Plaet B.V.. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 10 MW |
| Capacity | 20 MWh |
| Duration | 2.0 hours |
| Status | Built or due, running not confirmed, as of 20 October 2026 |
| Stated date | 2024, planned summer 2024 |
| Municipality | Ooltgensplaat, Goeree-Overflakkee, Zuid-Holland |
| Placed on the map | at Ooltgensplaat, the place its source names (GeoNames) |
| How sure | Possible: a single or old source, not confirmed since |
Who is behind it
| Owner | De Plaet B.V. |
| Built by | Alfen |
Not published anywhere we have found: traded by.
What the sources say
MW is given as 'nearly 10 MW'.; Status set to fid: a supply contract was signed (December 2023). No source confirms it was built or runs. Possible. No source since December 2023 says whether it was built.
Evidence and sources
- source: solarmagazine.nl/nieuws-zonne-energie/i36079/alfen-levert-batter…
- source: alfen.com/en/news/alfen-signs-agreement-windpark-plaet-in…
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B25.