The Netherlands · the named batteries
Woldjerspoor solar park battery
Announced, 10 MW · 20 MWh, in Groningen, owned by GroenLeven. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 10 MW |
| Capacity | 20 MWh |
| Duration | 2.0 hours |
| Status | Announced, as of 20 October 2026 |
| Municipality | Groningen, Groningen |
| Grid connection | existing 10 MVA solar park connection |
| Placed on the map | at the centre of Groningen, its municipality (GeoNames) |
| How sure | Possible: a single or old source, not confirmed since |
Who is behind it
| Owner | GroenLeven |
Not published anywhere we have found: traded by, built by.
What the sources say
Early planning in November 2022; site not fixed (Bedrijventerrein Zuid-Oost preferred) and the 10 MW figure depended on grid studies. No later source found. New in this round.
Evidence and sources
From the owners’, developers’ and builders’ own releases, grid operators’ and permit notices and the trade press, read by Vitreous. No Dutch body publishes a meter, an instruction or a payment for a named battery, so this page carries none. List id NL-B58.