A battery of 2 MW and 4 MWh in Bellignat, on Enedis’s distribution grid, in service since 17 December 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 2 MW |
| Energy | 4 MWh |
| Hours at full power | 2.0 |
| Charging power | 2 MW |
| In service | 17 December 2025 |
| Commune | Bellignat, Ain, Auvergne-Rhône-Alpes |
| Network | Enedis, HTA |
| Substation it connects through | Bellignat (BELLI) |
| Placed on the map | at the distribution substation it connects through (Bellignat), from Caparéseau |
| EIC code | 17W0000023940273 |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.