BORALEX STOCKAGE

A battery of 2.16 MW and 0 MWh in Chervey, on Enedis’s distribution grid, in service since 5 June 2018. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power2.16 MW
Energy0 MWh
Hours at full power0.0
Charging power2 MW
In service5 June 2018
CommuneChervey, Aube, Grand Est
NetworkEnedis, HTA
Substation it connects throughVendeuvre-Sur-Barse (V.BAR)
Placed on the mapat the distribution substation it connects through (Vendeuvre-Sur-Barse), from Caparéseau
EIC code17W000000476675G

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.