GENEVILLIERS
A battery of 0.22 MW and 0.11 MWh in Gennevilliers, on Enedis’s distribution grid, in service since 6 May 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 0.22 MW |
| Energy | 0.11 MWh |
| Hours at full power | 0.5 |
| In service | 6 May 2026 |
| Commune | Gennevilliers, Hauts-de-Seine, Île-de-France |
| Network | Enedis, BT |
| Substation it connects through | Tilliers (TILLI) |
| Placed on the map | at the distribution substation it connects through (Tilliers), from Caparéseau |
| EIC code | 17W000002469870U |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.