IDEX SOLAIRE ET MOBILITE

A battery of 4.96 MW and 3 MWh in Saint-Sauveur, on Enedis’s distribution grid, in service since 4 August 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power4.96 MW
Energy3 MWh
Hours at full power0.6
In service4 August 2026
CommuneSaint-Sauveur, Somme, Hauts-de-France
NetworkEnedis, HTA
Substation it connects throughArgoeuves (ARGOE)
Placed on the mapat the distribution substation it connects through (Argoeuves), from Caparéseau
EIC code17W0000025153003

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.