LEFOREST B
A battery of 3.45 MW and 3.45 MWh in Leforest, on Enedis’s distribution grid, in service since 23 April 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 3.45 MW |
| Energy | 3.45 MWh |
| Hours at full power | 1.0 |
| Charging power | 3.45 MW |
| In service | 23 April 2024 |
| Commune | Leforest, Pas-de-Calais, Hauts-de-France |
| Network | Enedis, HTA |
| Substation it connects through | Henin (HENIN) |
| Placed on the map | at the distribution substation it connects through (Henin), from Caparéseau |
| EIC code | 17W000001978154S |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.