LGBD1 SS7 CION

A battery of 0.1 MW and 0.23 MWh in Saint-Jurs, on Enedis’s distribution grid, in service since 23 July 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power0.1 MW
Energy0.23 MWh
Hours at full power2.2
Charging power0.11 MW
In service23 July 2026
CommuneSaint-Jurs, Alpes-de-Haute-Provence, Provence-Alpes-Côte d'Azur
NetworkEnedis, BT
Substation it connects throughRoumoules (ROUMO)
Placed on the mapat the distribution substation it connects through (Roumoules), from Caparéseau
EIC code17W000002499895X

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.