NWJ MET 3

A battery of 1.24 MW and 2.43 MWh in Loscouët-sur-Meu, on Enedis’s distribution grid, in service since 23 October 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service23 October 2025
CommuneLoscouët-sur-Meu, Côtes-d'Armor, Bretagne
NetworkEnedis, HTA
Substation it connects throughGAEL
Placed on the mapat the centre of its commune, Loscouët-sur-Meu, from geo.api.gouv.fr
EIC code17W000002363559U

The company

This battery is filed under the name of a company, NWJ MET 3 (SIREN 902890292), registered 15 July 2021 with its seat in Paris. The company register lists its officers as:

The company register as read by recherche-entreprises.api.gouv.fr on 20 October 2026, Licence Ouverte. Officers are not owners: a company’s president is usually its parent company, but the register of shareholders is not public.

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.