Vitreous LabsEnergy transparency

NWJ MET 3

A battery of 1.16 MW and 0.9 MWh in Saint-Michel-sur-Meurthe, on Enedis’s distribution grid, in service since 23 October 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.16 MW
Energy0.9 MWh
Hours at full power0.8
Charging power1.25 MW
In service23 October 2024
CommuneSaint-Michel-sur-Meurthe, Vosges, Grand Est
NetworkEnedis, HTA
Substation it connects throughSt Michel Sur Meurthe (SSMEU)
Placed on the mapat the distribution substation it connects through (St Michel Sur Meurthe), from Caparéseau
EIC code17W0000021033301

The company

This battery is filed under the name of a company, NWJ MET 3 (SIREN 902890292), registered 15 July 2021 with its seat in Paris. The company register lists its officers as:

The company register as read by recherche-entreprises.api.gouv.fr on 20 October 2026, Licence Ouverte. Officers are not owners: a company’s president is usually its parent company, but the register of shareholders is not public.

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map