NWJ MET 4

A battery of 1.24 MW and 2.43 MWh in Sceaux-sur-Huisne, on Enedis’s distribution grid, in service since 30 July 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
In service30 July 2026
CommuneSceaux-sur-Huisne, Sarthe, Pays de la Loire
NetworkEnedis, HTA
Substation it connects throughConnerre (CONNE)
Placed on the mapat the distribution substation it connects through (Connerre), from Caparéseau
EIC code17W000002500412N

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.