NWJ MET ABBEVILLE LES CONFLANS II

A battery of 1.24 MW and 2.43 MWh in Abbéville-lès-Conflans, on Enedis’s distribution grid, in service since 10 December 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service10 December 2025
CommuneAbbéville-lès-Conflans, Meurthe-et-Moselle, Grand Est
NetworkEnedis, HTA
Substation it connects throughLa Moulinelle (MOULI)
Placed on the mapat the distribution substation it connects through (La Moulinelle), from Caparéseau
EIC code17W000002389817T

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.