Vitreous LabsEnergy transparency

NWJ MET Authezat

A battery of 1.24 MW and 2.43 MWh in Authezat, on Enedis’s distribution grid, in service since 11 December 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service11 December 2025
CommuneAuthezat, Puy-de-Dôme, Auvergne-Rhône-Alpes
NetworkEnedis, HTA
Substation it connects throughMartres De Veyre (M.VEY)
Placed on the mapat the distribution substation it connects through (Martres De Veyre), from Caparéseau
EIC code17W000002389395T

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map