NWJ MET Avoine

A battery of 1.6 MW and 0.9 MWh in Avoine, on Enedis’s distribution grid, in service since 21 May 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.6 MW
Energy0.9 MWh
Hours at full power0.6
Charging power1.25 MW
In service21 May 2024
CommuneAvoine, Indre-et-Loire, Centre-Val de Loire
NetworkEnedis, HTA
Substation it connects throughChinon (CHIN5)
Placed on the mapat the distribution substation it connects through (Chinon), from Caparéseau
EIC code17W000001995899I

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.