A battery of 1.25 MW and 0.78 MWh in Bourbon-l'Archambault, on Enedis’s distribution grid, in service since 9 February 2023. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.25 MW
Energy0.78 MWh
Hours at full power0.6
Charging power1.25 MW
In service9 February 2023
CommuneBourbon-l'Archambault, Allier, Auvergne-Rhône-Alpes
NetworkEnedis, HTA
Substation it connects throughBourbon-L Archambault (B.ARC)
Placed on the mapat the distribution substation it connects through (Bourbon-L Archambault), from Caparéseau
EIC code17W0000014960135

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.