Vitreous LabsEnergy transparency

NWJ MET Chagey

A battery of 1.24 MW and 2.43 MWh in Chagey, on Enedis’s distribution grid, in service since 9 December 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service9 December 2025
CommuneChagey, Haute-Saône, Bourgogne-Franche-Comté
NetworkEnedis, HTA
Substation it connects throughArgiesans (ARGIE)
Placed on the mapat the distribution substation it connects through (Argiesans), from Caparéseau
EIC code17W0000023895506

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map