NWJ MET CHATEAU CHINON CAMPAGNE

A battery of 1.57 MW and 0.78 MWh in Château-Chinon (Campagne), on Enedis’s distribution grid, in service since 15 December 2021. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.57 MW
Energy0.78 MWh
Hours at full power0.5
Charging power1.25 MW
In service15 December 2021
CommuneChâteau-Chinon (Campagne), Nièvre, Bourgogne-Franche-Comté
NetworkEnedis, HTA
Substation it connects throughChateau-Chinon (C.CHI)
Placed on the mapat the distribution substation it connects through (Chateau-Chinon), from Caparéseau
EIC code17W000001351482Q

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.