NWJ MET CHATEAUNEUF DU FAOU

A battery of 1.25 MW and 0.78 MWh in Châteauneuf-du-Faou, on Enedis’s distribution grid, in service since 3 August 2022. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.25 MW
Energy0.78 MWh
Hours at full power0.6
Charging power1.25 MW
In service3 August 2022
CommuneChâteauneuf-du-Faou, Finistère, Bretagne
NetworkEnedis, HTA
Substation it connects throughKerbiliguet (KERBI)
Placed on the mapat the distribution substation it connects through (Kerbiliguet), from Caparéseau
EIC code17W000001410282J

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.