NWJ MET GENNES-SUR-SEICHE

A battery of 1.16 MW and 2.43 MWh in Gennes-sur-Seiche, on Enedis’s distribution grid, in service since 9 October 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.16 MW
Energy2.43 MWh
Hours at full power2.1
Charging power1.16 MW
In service9 October 2025
CommuneGennes-sur-Seiche, Ille-et-Vilaine, Bretagne
NetworkEnedis, HTA
Substation it connects throughArgentre-Du-Plessis (A.PLE)
Placed on the mapat the distribution substation it connects through (Argentre-Du-Plessis), from Caparéseau
EIC code17W0000023633567

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.