Vitreous LabsEnergy transparency

NWJ MET Gien B

A battery of 1.16 MW and 2.43 MWh in Gien, on Enedis’s distribution grid, in service since 25 June 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.16 MW
Energy2.43 MWh
Hours at full power2.1
Charging power1.16 MW
In service25 June 2025
CommuneGien, Loiret, Centre-Val de Loire
NetworkEnedis, HTA
Substation it connects throughGIEN
Placed on the mapat the centre of its commune, Gien, from geo.api.gouv.fr
EIC code17W000002281876N

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map