NWJ MET II VARANGEVILLE
A battery of 1.25 MW and 0.9 MWh in Varangéville, on Enedis’s distribution grid, in service since 23 February 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 1.25 MW |
| Energy | 0.9 MWh |
| Hours at full power | 0.7 |
| Charging power | 1.25 MW |
| In service | 23 February 2024 |
| Commune | Varangéville, Meurthe-et-Moselle, Grand Est |
| Network | Enedis, HTA |
| Substation it connects through | Varangeville (VARAN) |
| Placed on the map | at the distribution substation it connects through (Varangeville), from Caparéseau |
| EIC code | 17W000001714265F |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.