Vitreous LabsEnergy transparency

NWJ MET LOCHE SUR INDROIS

A battery of 1.25 MW and 0.78 MWh in Loché-sur-Indrois, on Enedis’s distribution grid, in service since 17 April 2023. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.25 MW
Energy0.78 MWh
Hours at full power0.6
Charging power1.25 MW
In service17 April 2023
CommuneLoché-sur-Indrois, Indre-et-Loire, Centre-Val de Loire
NetworkEnedis, HTA
Substation it connects throughChatillon-Sur-Indre (CHAT7)
Placed on the mapat the distribution substation it connects through (Chatillon-Sur-Indre), from Caparéseau
EIC code17W000001523384K

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map