NWJ MET MONTAGNY LES BEAUNE II
A battery of 1.24 MW and 2.43 MWh in Montagny-lès-Beaune, on Enedis’s distribution grid, in service since 27 June 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 1.24 MW |
| Energy | 2.43 MWh |
| Hours at full power | 2.0 |
| Charging power | 1.24 MW |
| In service | 27 June 2025 |
| Commune | Montagny-lès-Beaune, Côte-d'Or, Bourgogne-Franche-Comté |
| Network | Enedis, HTA |
| Substation it connects through | Montagny (Les Beaune) (MTAGN) |
| Placed on the map | at the distribution substation it connects through (Montagny (Les Beaune)), from Caparéseau |
| EIC code | 17W0000022823389 |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.