NWJ MET MONTAGNY LES BEAUNE II

A battery of 1.24 MW and 2.43 MWh in Montagny-lès-Beaune, on Enedis’s distribution grid, in service since 27 June 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service27 June 2025
CommuneMontagny-lès-Beaune, Côte-d'Or, Bourgogne-Franche-Comté
NetworkEnedis, HTA
Substation it connects throughMontagny (Les Beaune) (MTAGN)
Placed on the mapat the distribution substation it connects through (Montagny (Les Beaune)), from Caparéseau
EIC code17W0000022823389

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.