Vitreous LabsEnergy transparency

NWJ MET MONTENEUF

A battery of 1.24 MW and 2.43 MWh in Monteneuf, on Enedis’s distribution grid, in service since 31 July 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service31 July 2025
CommuneMonteneuf, Morbihan, Bretagne
NetworkEnedis, HTA
Substation it connects throughGUER
Placed on the mapat the centre of its commune, Monteneuf, from geo.api.gouv.fr
EIC code17W0000023008731

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map