A battery of 1.16 MW and 2.43 MWh in Montgermont, on Enedis’s distribution grid, in service since 21 August 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.16 MW
Energy2.43 MWh
Hours at full power2.1
Charging power1.16 MW
In service21 August 2025
CommuneMontgermont, Ille-et-Vilaine, Bretagne
NetworkEnedis, HTA
Substation it connects throughLes Talus (TALUS)
Placed on the mapat the distribution substation it connects through (Les Talus), from Caparéseau
EIC code17W000002316047Z

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.