NWJ MET MONTS

A battery of 1.16 MW and 0.9 MWh in Monts, on Enedis’s distribution grid, in service since 12 December 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.16 MW
Energy0.9 MWh
Hours at full power0.8
Charging power1.25 MW
In service12 December 2024
CommuneMonts, Indre-et-Loire, Centre-Val de Loire
NetworkEnedis, HTA
Substation it connects throughJoue-Les-Tours (J.TOU)
Placed on the mapat the distribution substation it connects through (Joue-Les-Tours), from Caparéseau
EIC code17W000002146327P

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map