Vitreous LabsEnergy transparency

NWJ MET Nogent sur Seine

A battery of 1.25 MW and 0.78 MWh in Nogent-sur-Seine, on Enedis’s distribution grid, in service since 4 February 2022. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.25 MW
Energy0.78 MWh
Hours at full power0.6
Charging power1.25 MW
In service4 February 2022
CommuneNogent-sur-Seine, Aube, Grand Est
NetworkEnedis, HTA
Substation it connects throughNogent-Sur-Seine (N.SEI)
Placed on the mapat the distribution substation it connects through (Nogent-Sur-Seine), from Caparéseau
EIC code17W000001365807Z

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map