Vitreous LabsEnergy transparency

NWJ MET Saint-Didier-de-Formans

A battery of 1.24 MW and 2.43 MWh in Saint-Didier-de-Formans, on Enedis’s distribution grid, in service since 9 July 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service9 July 2025
CommuneSaint-Didier-de-Formans, Ain, Auvergne-Rhône-Alpes
NetworkEnedis, HTA
Substation it connects throughSt-Bernard (SSBE5)
Placed on the mapat the distribution substation it connects through (St-Bernard), from Caparéseau
EIC code17W000002301455E

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map