Vitreous LabsEnergy transparency

NWJ MET SAINT-GEORGES

A battery of 1.24 MW and 0.9 MWh in Saint-Georges-sur-Renon, on Enedis’s distribution grid, in service since 28 October 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy0.9 MWh
Hours at full power0.7
Charging power1.25 MW
In service28 October 2025
CommuneSaint-Georges-sur-Renon, Ain, Auvergne-Rhône-Alpes
NetworkEnedis, HTA
Substation it connects throughLa Chapelle-Du-Chatelard (C.CHA)
Placed on the mapat the distribution substation it connects through (La Chapelle-Du-Chatelard), from Caparéseau
EIC code17W000002363431J

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.