NWJ MET SAINT-VINCENT-D'AUTEJAC

A battery of 1.25 MW and 0.78 MWh in Saint-Vincent-d'Autéjac, on Enedis’s distribution grid, in service since 4 December 2023. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.25 MW
Energy0.78 MWh
Hours at full power0.6
Charging power1.25 MW
In service4 December 2023
CommuneSaint-Vincent-d'Autéjac, Tarn-et-Garonne, Occitanie
NetworkEnedis, HTA
Substation it connects throughLERE
Placed on the mapat the centre of its commune, Saint-Vincent-d'Autéjac, from geo.api.gouv.fr
EIC code17W0000016859311

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.