Vitreous LabsEnergy transparency

NWJ MET Sarrebourg

A battery of 1 MW and 2.43 MWh in Sarrebourg, on Enedis’s distribution grid, in service since 30 July 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1 MW
Energy2.43 MWh
Hours at full power2.4
Charging power1 MW
In service30 July 2026
CommuneSarrebourg, Moselle, Grand Est
NetworkEnedis, HTA
Substation it connects throughSarrebourg (SARRE)
Placed on the mapat the distribution substation it connects through (Sarrebourg), from Caparéseau
EIC code17W0000025006434

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map